Well equipped and supported by nearly four decades of industry experience, W&B Civil Engineering has the capability and expertise to deliver complex deep drainage systems across a wide range of projects.

Our teams are experienced in managing every stage of the process, including the design, coordination and installation of all necessary temporary works to ensure safe and efficient delivery. From deep excavations and trench support systems to confined working environments, we have the knowledge, equipment and skilled workforce required to successfully deliver challenging drainage installations.

This practical experience, built up over almost 40 years in the industry, enables W&B to provide reliable, well-managed solutions for even the most demanding drainage projects.

Drainage

A56 Chester Road, Daresbury

Date:2025 - 2026
Value:£450k Plant & Labour
Location:Warrington
Client:D Morgan / Balfour Beatty

The reconstruction of the A56 Chester Road formed part of wider highway improvement works designed to upgrade a key route serving the Daresbury area and surrounding transport network.

Working alongside Balfour Beatty and D. Morgan plc, W&B Civil Engineering was responsible for the removal and reconstruction of sections of the existing highway drainage infrastructure.

Our scope of works included the removal of existing drainage ducts and road gullies, along with associated excavation and preparation works required to facilitate the carriageway reconstruction programme. These works were delivered in coordination with the wider highway improvement activities, ensuring that the drainage infrastructure was upgraded to meet the requirements of the new road construction.

Operating within a live highway environment required careful planning, traffic management coordination and strict adherence to safety procedures. Through experienced site teams and efficient programme delivery, W&B successfully completed the drainage and enabling works required to support the reconstruction of this important section of the A56 corridor

93202681 A810 4f16 9965 5e4d847c5aca

Drainage

Parkside Link Road

Date:2024 - 2026
Value:£2.3 Million Plant & Labour
Location:Warrington
Client:D Morgan / Balfour Beatty

The Parkside Link Road is a major infrastructure project designed to improve local connectivity and relieve commuter congestion in the surrounding road network. The scheme involves the construction of a new 3.3km highway linking the area to the M6 motorway at Junction 22, helping to divert traffic away from local routes and improve access for both commuters and commercial traffic.

Working alongside Balfour Beatty and D. Morgan plc, W&B Civil Engineering delivered key elements of the drainage infrastructure across sections of the scheme.

Our scope included the installation of mainline highway drainage and associated chambers, forming a critical part of the road’s surface water management system. These works involved excavation, installation of pipework and the construction of drainage chambers designed to manage runoff from the new carriageway and protect the long-term integrity of the road structure.

Delivered as part of the wider highway construction programme, the works required careful coordination with ongoing earthworks and road construction activities. Through experienced site teams, specialist plant and effective programme management, W&B successfully delivered the drainage infrastructure required to support the construction of this important new transport link.

Poulton List Image

Drainage

Poulton le Fylde

Date:2019
Value:£295,000 Labour & Plant
Location:Poulton le Fylde
Client:Eric Wright Group

Installation of a complex drainage system (including pumping station and rising main), running alongside the existing main rail link into Poulton le Fylde. Dewatering was carried out, by us, before drainage works could commence.

Omega North South List Image

Drainage

Omega North & South Developments

Date:2018 - ongoing
Value:£2 Million
Location:Warrington
Client:D Morgan

Over the last 10 years, W&B have worked continuously with D Morgan on the Omega North & South Development. The schemes included both Industrial and housing developments. We have undertaken the installation of main road drainage and plot drainage (both surface and foul water).

Cpuk

Drainage

CPUK Morecambe

Date:2018
Value:£1.5 Million Labour & Plant
Location:Morecambe
Client:Construction Partnership UK

Project included road, surface water & foul drainage to the new housing development, comprising of 278 works for main outfall, pumping station & all groundworks up to and including concrete slabs.

Contact our Commercial Team

ACCREDITATIONS

DELIVERING QUALITY

SINCE 1987

We pride ourselves on safety, efficiency, transparency and competence
Chas accreditation logoConstructonline accreditation logo
Builder's Profile accreditation logoSmas Worksafe accreditation logo